Presentation Information

[VI-940]Rebound study and countermeasures for open cut construction that has a subway tunnel deeper than the excavation(No.1)

*Masahiro Ohtaka1, Taito Sato1, Takeo Takahashi1, Tomonori Koike1, Yutaka Saito2 (1. SHIMIZU CORPORATION, 2. Tokyo Metropolitan Bureau of Transportation)
PDF DownloadDownload PDF

Keywords:

Open cut construction,Close construction,rebound,3D FEM analysis

Login required to view

Login is required to view some content.

Comment

To browse or post comments, you must log in.Log in