Presentation Information

[VI-941]Rebound study and countermeasures for open cut construction that has a subway tunnel deeper than the excavation(No.2)

*Taito Sato1, Masahiro Ohtaka1, Takeo Takahashi1, Tomonori Koike1, Yutaka Saito2 (1. SHIMIZU CORPORATION, 2. Tokyo Metropolitan Bureau of Transportation.)
PDF DownloadDownload PDF

Keywords:

open cut method,neighboring work,jet grouting,freestanding retaining wall

Login required to view

Login is required to view some content.

Comment

To browse or post comments, you must log in.Log in