Presentation Information

[CS17-36]Verification of labor-saving effect of BIM/CIM model automatic generation tool for rebar arrangement

*Rina Yoneki1, Kenta Tachibana1, Takahiro Ito2, Koji Yamada2, Rei Fujita3, Hiroshi Kasai4 (1. OBAYASHI CORPORATION, 2. Yachiyo Engineering Co., Ltd., 3. CTI Engineering Co., Ltd., 4. Terra Drone Corporation)

Keywords:

BIM/CIM,Linkage between 3D reinforcement models and 2D reinforcement drawings,Automativally genetated,Parametric design