Session Details

データ連携とプロセス改革(6)

Fri. Sep 12, 2025 10:40 AM - 12:00 PM JST
Fri. Sep 12, 2025 1:40 AM - 3:00 AM UTC
3F E2

[CS17-32]Utilization of the Digital Twin System in the Truck Crane Bent Method

*Kohei Suke1, Junichi Nagata1, Ruike Keishi1 (1. TAKADA KIKO CO.,LTD)

[CS17-33]Example of Efficient Construction Management Using 360-Degree Cameras and Laser Scanners-Construction sites evolving through data sharing and utilization

*Yasuhisa Higuchi1, hatanaka kotaro1, kawakami yusaku1, uemura hajime1, saratani masayuki1 (1. IHI Infrastructure Systems)

[CS17-34]Development of a Tool for Automatic Generation of BIM/CIM Reinforcement Models to Improve Productivity

*Takashi Wakimura1, Shinichiro Furusho1, Koichi Egusa3, Hiroaki Ueda3, Takuya Shiomi2, Yuki Yajima2, Shintaro Matsuzaki4 (1. Obayashi Co., 2. CTI Engineering Co.,Ltd., 3. Yachiyo Engineering Co., Ltd., 4. TerraDrone Co.)

[CS17-35]System specification of automatic generation tool for BIM/CIM reinforcement models

*Akio Utsumoto1, Sho Kawase2, Shiori Numata3, Isamu Yanagita3, Miyako Kanemitsu4, Koyuki Atarashi4 (1. Terra Drone Corp., 2. Obayashi Corp., 3. CTI Engineering Co., Ltd., 4. Yachiyo Engineering Co., Ltd.)

[CS17-36]Verification of labor-saving effect of BIM/CIM model automatic generation tool for rebar arrangement

*Rina Yoneki1, Kenta Tachibana1, Takahiro Ito2, Koji Yamada2, Rei Fujita3, Hiroshi Kasai4 (1. OBAYASHI CORPORATION, 2. Yachiyo Engineering Co., Ltd., 3. CTI Engineering Co., Ltd., 4. Terra Drone Corporation)

[CS17-37]Verification of Rebar Drawing Generation Using 3D Parametric Models

*Miho Tanaka1, Masato Kikuchi1, Junpei Yasushita1, Hiroyuki Daifuku2, Youji Aoki2, Junki Matsubara2 (1. PACIFIC CONSULTANTS CO., LTD., 2. OTSUKA CORPORATION)