Presentation Information
[VI-1346]Pilot Tunnel Construction Directly Below the Shinkansen Track and Existing Utility Tunnel (Part 1: Design)
*Kaede Kawabata1, Tatsuhiro Shoji1, Makoto Yonei1, Masahiko Ogawa1, Hironori Urushido2 (1. Shimizu Corporation, 2. Central Japan Railway Co.)
Keywords:
Messel method,pilot tunnel,underpinning,directly beneath the Shinkansen track