[VI-1340]Construction of steel pipe brackets in Tokaido Shinkansen viaduct underpinning —Chuo Shinkansen Nagoya Station—
Rikiya Saito1, Kenta Yamamoto1, *Azumi Matsuura1, Takahiro Inukai2, Takahiro Watanabe2 (1. Central Japan Railway Company, 2. OBAYASHI CORPORATION)
[VI-1341]Report on construction of earth retaining wall in open cut tunnel usingu TBH Construction Method with movement of railway facility access passage at underground continual two-level crossing business
*Wataru Nakajima1, Takeki Hirabayashi1, Keiichiro Ichihana1, Shun Ogino2, Yuichi Toyama2, Hiroki Nakazawa2 (1. SHIMIZU Co., Ltd., 2. SEIBU RAILWAY Co.,Ltd.)
[VI-1342]Construction report of piperoof for temporary track support in underground continuous grade separation project (No.1)
*Keiichiro Ichihana1, Takeki Hirabayashi1, Taito Sato1, Shun Ogino2, Yuichi Toyama2, Hiroki Nakazawa2 (1. SHIMIZU CORPORATION, 2. SEIBU RAILWAY Co.,Ltd.)
[VI-1343]Construction report of piperoof for temporary track support in underground continuous grade separation project (Part 2)
*Taito Sato1, Masahiro Ohtaka1, Hirabayashi Takeki1, Ichihana Keiichirou1, Ogino Syun2, Toyama Yuichi2, Nakazawa Hiroki2 (1. Shimizu Corporation, 2. SEIBU RAILWAY Co.,Ltd.)
[VI-1344]construction work of the subway station structure(part1) =construction of the operating line=
*Haruhide Ishida1, Keito Horiguchi1, Tatsuya Kondo1, Masayuki Inoue1, Satoru Fujino2, Shota Hosokawa2, Masaya Takahashi2, Kyosuke Maeda2 (1. TAISEI CORPOREATION, 2. Tokyo Metro Co.,Ltd.)
[VI-1345]Construction work of the subway station structure(Part 2)=Design of the replacement frame=
*Masayuki Inoue1, Haruhide Ishida1, Keito Horiguchi1, Tatsuya Kondo1, Satoru Fujino2, Shota Hosokawa2, Masaya Takahashi2, kyosuke Maeda2 (1. TAISEI CORPORATION, 2. Tokyo Metro Co.,Ltd.)
[VI-1346]Pilot Tunnel Construction Directly Below the Shinkansen Track and Existing Utility Tunnel (Part 1: Design)
*Kaede Kawabata1, Tatsuhiro Shoji1, Makoto Yonei1, Masahiko Ogawa1, Hironori Urushido2 (1. Shimizu Corporation, 2. Central Japan Railway Co.)
[VI-1347]Pilot Tunnel Construction Directly Below the Shinkansen Track and Existing Utility Tunnel (Part 2: Construction)
*Makoto Yonei1, Ogawa Masahiko1, Tatsuhiro Shoji1, Kaede Kawabata1, Hironori Urushido2 (1. Shimizu Corporation, 2. Central Japan Railway Co.)