Presentation Information
[VI-1347]Pilot Tunnel Construction Directly Below the Shinkansen Track and Existing Utility Tunnel (Part 2: Construction)
*Makoto Yonei1, Ogawa Masahiko1, Tatsuhiro Shoji1, Kaede Kawabata1, Hironori Urushido2 (1. Shimizu Corporation, 2. Central Japan Railway Co.)
Keywords:
Messel method,pilot tunnel,underpinning,directly beneath the Shinkansen track