Presentation Information

[VI-998]Construction report of connection to the existing tunnel by the T-joint method under high water pressure

*Yuji Mineo1, hiroshi ooishi1, kouchi hasegawa1, yasuo shibuma1 (1. Nishimatsu Construction)

Keywords:

T-joint construction method,T-BOSS method,shield,direct cutting of existing pipes,underground joint