Session Details
シールドトンネル(9)
Fri. Sep 12, 2025 3:10 PM - 4:30 PM JST
Fri. Sep 12, 2025 6:10 AM - 7:30 AM UTC
Fri. Sep 12, 2025 6:10 AM - 7:30 AM UTC
E205
[VI-992]Launching method of a large-section road shield tunnel within the main established shaft structure
*Moe Shinkuma1, Ishida Seiichi1, Kameda Yoshiaki1, Morita Kohei1 (1. TAISEI CORPORATION)
[VI-993]Construction record of combined main body structure at shield tunnel entrance
*Yuya Miyazaki1 (1. MAEDA CORPORATION)
[VI-994]Development and performance verification of FRP shield temporary wall cutting parts (SoftFRP)
*Yuta Chanoki1, Takashi Tanaka1, Hirofumi Tanaka1 (1. Toda Corporation)
[VI-995]Development of Machinable Earth Retaining Wall Made of GFRP-Concrete Composite Structure
Verification of the reinforcing effect of combining with GFRP against tensile stress due to bending through small-scale bending tests
*Sachi Umezawa1, Fujii Sen2, Nakamura Seiji3, Iwanami Motoi4 (1. SEKISUI CHEMICAL CO., LTD., 2. DAIHO CORPORATION, 3. NIPPON CIVIC CONSULTING ENGINEERS CO.,LTD, 4. Iwanami Underground Structure Professional Engineer Office Co., Ltd.)
[VI-996]Cutting test of direct cutting wall for shield tunneling method.
*Kenji Okubo1, Kosuke Takami2, Motoi Iwanami3 (1. DAIHO CORPORATION, 2. SEKISUI CHEMICAL CO.,LTD., 3. Iwanami Underground Structure Professional Engineer Office Co., Ltd.)
[VI-997]Development of high water pressure-compatible attainable entrances
*Keisuke Masuda1, Nobuaki Sueno1, Yasushi Fukuda1 (1. TODA CORPORATION)
[VI-998]Construction report of connection to the existing tunnel by the T-joint method under high water pressure
*Yuji Mineo1, hiroshi ooishi1, kouchi hasegawa1, yasuo shibuma1 (1. Nishimatsu Construction)
[VI-999]Underground connecting of 2 shield tunneling machines with freezing method
*Shota Saito1, Koki Hongo1, Shota Fukuda2 (1. TODA CORPORATION, 2. Tokyo Waterworks)