[2N05]Flush-out for Tokai Reprocessing Plant decommissioning(4) Removal of the U solution

*masayuki ohuchi1, yoshiyuki kishi1, hiroyasu isobe1, takeshi yasuda1, yuji yada1, shohei suzuki1, hayate tokoro1, shota kusaka1, keita shoji1, hirotaka samoto1 (1. Japan Atomic Energy Agency)

Keywords:

Tokai Reprocessing Plant,decommissioning,Flush-out,U solution

Tokai Reprocessing Plant (TRP) retained nuclear materials such as spent fuel sheared powder, plutonium solution, and uranium solution due to TRP shift to decommissioning in anticipation of resuming reprocessing. Flush-out to sequentially remove these nuclear fuel materials was required for future decommissioning of equipment.U solution was denitrified to UO3 powder as the final stage of flush-out, stored in the uranium storage. We performed inspections and training, simultaneously transferring technical knowledge to young engineers. Safe and stable processing was achieved by establishing conditions that could treat lower-concentration U solution and prevent nozzle clogging. Additionally, by denitrifying the diluted U solution in the feed tank, the washing waste was significantly reduced. Through these efforts, flush-out for TRP was successfully completed.

Comment

To browse or post comments, you must log in.Log in