[1D07]Development of Clearance Measurement and Evaluation Method for Concrete in BWR Buildings(1) Investigation of Contamination Conditions
*Takehisa Ohkura1, Masato Watanabe1, Ryosuke Tanaka2, Naoya Matsushita2, Takahiro Fukuhara3, Kazuhiko Takaji4 (1. Chubu Electric Power, 2. TCC, 3. Advanced Fusion Technology, 4. TAKENAKA CORPORATION)
Keywords:
Clearance,BWR,Concrete,Radioactive concentration,Secondary contamination,Penetration,Carbon 14
A contamination survey was conducted in the torus room on the basement second floor of Unit 2 at the Hamaoka Nuclear Power Plant. This study was performed as a preliminary investigation for removal and clearance of part of the concrete in the room. Areas with cracks in the protective coating and a drain funnel of the lowest level section were examined. The results showed that Carbon 14 (C-14) was detected in the concrete beneath the coating, although the concentration was well below the clearance level. The ratio of C-14 to Cobalt 60 (Co-60) exceeded 1, indicating that C-14 is the dominant radionuclide. C-14 was detected on horizontal surfaces, while it was not detected on sloped surfaces or in the funnel section.
Comment
To browse or post comments, you must log in.Log in