Presentation Information

[CS1-25]Construction of the side spans of a PC continuous bridge in steep terrain.

*Takahisa Sakurai1 (1. THE ZENITAKA CORPORATION)

Keywords:

PC superstructure,side span,abutment,Advance construction,gap,tensioned end