Presentation Information
[CS3-02]Planning and Design of the New Karuma Bridge to be Built in Uganda's National Park, Part 2: Structural Design
*Juliane Therese Rellas Bacod1, Takayuki Ohmori2, Shreya Thusoo1, Masaki Sumi2, Matasaka Fujikuma2 (1. Oriental Consultants Co., Ltd. , 2. Oriental Consultants Global Co., Ltd.)
Keywords:
Structural Design,Prestressed Concrete Bridge,Extradosed Bridge
