Presentation Information

[CS3-13]Trial design for improving the upper and lower connections of an existing continuous curved long viaduct

*Kazuhiko Sugahara1, Chisako Houji1, Hiroki Terada1, Akinori Hirose1 (1. Eight-Japan Engineering Consultants)

Keywords:

Super and Substructure Connection Section,Curved bridge,support direction of the bearing,Pin-Roller