Presentation Information
[II-05]Study on Unpowered Automatic Opening and Closing Gates to Improve Peak Cut Efficiency of Retarding Basin (Second Report)
*Ryosuke Inakage1, Tatsuya Kaname1, Kazuto Kaya1, Takahiro Iwasa1, Shogo Kato1, Kazuhito Kondo2, Takahiko Nishijima2, Hideyuki Niizato3, Masayuki Sotoyama3, Takeshi Nanka3, Norio Tanaka4 (1. CTI Engineering Co., Ltd., 2. Kyowa Concrete Industry Co., Ltd., 3. Kanadevia Corporation, 4. Saitama University)
Keywords:
retarding basin,overflow dike,conversion of overflow dike to movable weir,non-powered,automatic gate,airfoil
