Presentation Information

[VI-20]Restoration work in the Yashio Road collapse disaster (Part 1): Earth retention and support work using steel pipe piles and temporary restoration work for the rainwater main.

*Taro Kiwaki1, Masatoshi Kanbayashi1, Yoshihiro Hata2 (1. TAISEI CORPORATION Kanto Branch, 2. TAISEI CORPORATION Design Dept.)

Keywords:

disaster recovery,road cave-in,Yashio,Basin sewer,Storm drainage main,Steel pipe pile earth retention