[VI-22]Restoration work for the Yashio Road collapse disaster (Part 3): Structure of the temporary restoration work on the prefectural road enabling early reopening
*Shouma Kumazawa1, Masatoshi Kanbayashi1, Taro Kiwaki1, Katsuji Maeno1, Hironori Sato2 (1. Taisei Corporation, 2. Taisei Corporation Civil Engineering Design Department)
Keywords:
Disaster recovery,Matsudo-Soka Line,Pregader,Steel pipe pile,Gyropress construction method,FCB construction method