Session Details
地下空洞と地下構造物①
Thu. Sep 3, 2026 8:50 AM - 10:10 AM JST
Thu. Sep 3, 2026 11:50 PM - 1:10 AM UTC
Thu. Sep 3, 2026 11:50 PM - 1:10 AM UTC
Room 303, 3rd Floor, Building 1 (Hokkai School of Commerce)
[III-142]Regarding the examination of the extended section of the box culvert
*Hirofumi Fukuoka1 (1. West Nippon Expressway Engineering Kyushu Company Limited)
[III-143]Optimized Design of Precast Box Culverts Considering Backfilling Using EPS
*Yasuhiro Muto1, Kenta Tachibana1 (1. Obayashi Corporation)
[III-144]A Basic Study on the Seismic Response of Underground Box Culverts with Neighboring Structures
*Hiroaki Okada1, Koji Takanuma1, Yumi Sayama1 (1. Shimz Corporation)
[III-145]Comparative evaluation of measured values and calculation methods for loosened earth pressure in element traction construction (Part 1)
*Seishi Nakamura1, Masaki Takayama2, Saki Nishiyama2 (1. J-TEC CORPORATION, 2. TEKKEN CORPORATION)
[III-146]Comparative Evaluation of Measured and calculated loosening pressure in the Element Pull method (Part 2)
*Masaki Takayama1, Saki Nishiyama1, Seishi Nakamura2 (1. TEKKEN CORPORATION, 2. J-TEC CORPORATION)
[III-147]A Comparative Study on Measured and Estimated Loosening Earth Pressure in the Element Jacking Method (Part 3)
*Saki Nishiyama1, Masaki Takayama1, Seishi Nakamura2 (1. TEKKEN CORPORATION, 2. J-TEC CORPORATION)
