道路橋床版・防水工・舗装の設計・維持管理に関する長寿命化技術(5)

Fri. Sep 4, 2026 3:10 PM - 4:30 PM JST
Fri. Sep 4, 2026 6:10 AM - 7:30 AM UTC
Room D30, 3rd Floor, Building 7 (Hokkai-Gakuen University)

[CS19-29]Comparison of PCaPC and UHPFRC deck slabs in deck slab replacement for non-composite plate girder bridges

*Toshimichi Ichinomiya1, Kimio Saito1, Tsuyoshi Hasegawa1, Yuichi Uchida1 (1. Association of UFC Road Bridge Deck)

[CS19-30]Advantageous Span of Girder Bridge for UHPFRC Deck Slab

*Nobuhiro Mitsukawa1, Kouji Tachi1, Hiroki Watanabe1, Jiro Tomita1, Yuichi Uchida1 (1. Association of UFC Road Bridge Deck)

[CS19-31]Effect of Dead Load Reduction through UFC Slab Replacement on the Reinforcement Volume of Existing Steel Girders

*Mitsutoshi Yamaguchi1, Michikazu Tawara1, yuichi Uchida1 (1. Association of UFC Road Bridge Deck)

[CS19-32]Example of steel girder reinforcement design when replacing a bridge deck and opening it to daytime traffic in a half-section

*Mitsuru Matsuoka1, Keigo Kubo1, Ryotaro Oshima2, Shungo Goto3, Isao Saiki4 (1. MIYAJI ENGINEERING CO., LTD., 2. Fuji P.S Corporation, 3. Central Nippon Expressway Company Limited, 4. Kyushu Institute of Technology)

[CS19-34]Reinforcement Plan for a Steel Composite Girder Bridge During Half-Width Slab Replacement Using a Gantry Crane at the Moizarigawa Bridge on the Do-O Expressway

*Satoshi Otsuka1, Shimazu Katsunori1, Uchida Misato1, Ozaki Hisashi2 (1. Toda Corporation., 2. East Nippon Expressway Company Limited.)

[CS19-35]Construction of Sliding-Type Precast Barrier Walls in Bridge Deck Replacement Projects

*Takehiro Hakamata1 (1. East Nippon Expressway Company Limited)

[CS19-36]A Study on Design Bending Moment Increment at Slab Ends during Highway Bridge Deck Replacement

*Taizo Mochizuki1, Katsunori Shimazu1, Satoshi Otsuka1 (1. Toda Corporation)