Session Details

[1C01-05]Refinery maintenance(1)

Thu. Oct 29, 2026 10:10 AM - 11:30 AM JST
Thu. Oct 29, 2026 1:10 AM - 2:30 AM UTC
Room-C (2F-International Conference Room)
Chair:
Toshikazu Ohmura (ENEOS)

[lUQgwKhS-1add]Process Eqipment Div. chief remarks

[1C01]Tightening training system of bolted flange connection for the worker established by JAMSEC (Japan Association of Maintenance and Service Contractors) (part 2)

○KOJI KONDO1 (1. RAIZNEXT Corporation)

[1C02]A case study of initiatives toward zero leakage from flanged joints

○Nobuyasu Takahama1 (1. Engineering&Maintenance Section Aichi Complex Idemitsu Kosan Co.,Ltd.)

[1C03]Maintenance considerations for heavy oil pumps

○Yuta Araki1 (1. SHOWA YOKKAICHI SEKIYU CO., LTD.)

[1C04]Response to piping construction in sulfide stress cracking environment— Examination of construction area selection through mock-up testing —

○mamoru tsurushima1, masao hirano2 (1. Idemitsu Kosan Co., Ltd. Chiba Complex Inspection & Reliability Section, 2. Idemitsu Kosan Co., Ltd. Chiba Complex Engineering & Maintenance Section)

[1C05]Examples of replacing float-type level gauges with radar-type level gauges due to malfunctions.

○WATARU HATASAWA1 (1. Fuji Oil Company)