Session Details

[22608-10]Session F3

Wed. Sep 18, 2024 4:40 PM - 5:40 PM JST
Wed. Sep 18, 2024 7:40 AM - 8:40 AM UTC
Room F(12-209)

[22608-10-01]Implementing LEAN Management to Reduce Maintenance Costs and Scraped Products of Electroplating Equipment

*Yu-Cheng Lin1, Shao-Chia Hsia1, Tian-Yi Hsu1, Chuen-Sheng Cheng2, Yu-Cheng Lin1 (1. Unimicron Technology Corporation (Taiwan), 2. Department of Industrial Engineering and Management, Yuan-Ze University (Taiwan))

[22608-10-02]Optimizing the Bump Process by Response Surface Methodology

*Sean Wang1, Sean Guo1, Chien-Yi Wang1, Vincent Huang1, Chuen-Sheng Cheng2 (1. Unimicron Technology Corp. (Taiwan), 2. Department of Industrial Engineering and Management, Yuan Ze University (Taiwan))

[22608-10-03]Reduction in Warranty Claims With Proactive Product Audit - Cut Tyre & Compound Rating

Pradeep Bhalachandra Gargote1, *Jignesh Sharda1 (1. CEAT ltd , Mumbai , India (India))